Free staffing tool

24/7 staffing calculator

Estimate the raw workforce capacity behind continuous coverage. Then use Rosterzen to test whether your actual people, skills, availability and work rules can actually cover those shifts.

Coverage inputs

Staffed hours/week
168
Raw FTE
4.20
Minimum whole people by hours
5
With entered relief allowance
5
This is a capacity estimate, not a feasible roster.
Skills, leave, availability, shift overlap, rest, consecutive-work limits and the exact rotation can increase the number of people you actually need. Use the schedule generator to test the real team.
Build the actual 24/7 roster →

See whether your actual team can cover the shifts

Add your real shifts, workers, availability and work rules to generate a 7-day schedule and see any gaps.

Full-screen generator
1 of 5

What kind of team are you scheduling?

Data residencyUnited States

Choose where your roster data is processed and stored.

Data residency

The basic 24/7 staffing formula

Weekly staffed hours = hours covered per day × days covered per week × people required at once. Divide that by the weekly hours available from one worker to get raw FTE. Round up for whole people, then separately consider relief, skills and work rules.

1 post × 24 hours × 7 days = 168 staffed hours
168 ÷ 40 hours/worker = 4.20 raw FTE
At least 5 whole people before relief and other staffing limits

Why raw FTE is not enough

Capacity can still fail when only one worker has a required qualification, a night worker reaches a consecutive-work limit, someone is on leave, or the available workers cannot legally or operationally move between adjacent shifts. That is why Rosterzen shows both peak people needed at once and the broader workforce needed across the full week.

Build a free schedule to test your team

Frequently asked questions

How many full-time employees are needed to cover one 24/7 position?

One continuously staffed position requires 168 staffed hours per week. At 40 available hours per worker, the raw mathematical requirement is 4.2 FTE, so at least five whole people before accounting for leave, training, qualifications, availability or rest rules.

Why does the calculator include relief capacity?

Raw FTE only divides staffed hours by worker hours. Real rosters also have leave, sickness, training, availability and working-time rules. Relief allowance is a planning input, not a universal percentage.

Does this prove my roster will work?

No. Two teams can have the same total hours and still schedule very differently because skills, overlapping shifts, rest and availability matter. The calculator estimates capacity; Rosterzen then tests your actual staff against the shifts that need covering.