24/7 staffing calculator

Estimate the raw workforce capacity behind continuous coverage. Then use Rosterzen to test whether your actual people, skills, availability and work rules can actually cover those shifts.

Coverage inputs

Continuous posts preset

Enter an extra buffer as a share of demand. At 20%, multiply raw FTE by 1.2. This differs from 20% unavailable time. Do not count the same absence twice.

Current employees are assumed to have the weekly capacity entered above. For mixed contracts, compare total usable hours separately. Percentages are your assumptions, not industry benchmarks.

Staffed hours/week
168.00
Raw FTE
4.20
Adjusted FTE
4.83
Minimum whole people
5

Enter current employees to compare the headcount gap.

168.00 staffed hours ÷ 40 scheduled hours = 4.20 raw FTE. Multiply by 1.1500 including the relief buffer = 4.83 adjusted FTE. Round up, with at least 1 people for simultaneous posts.

This is a capacity estimate, not a feasible roster.
Skills, availability, shift overlap, rest, consecutive-work limits and clustered leave can increase staffing needs. The estimate does not calculate overtime pay or establish legal compliance.
Build the actual 24/7 roster →

See whether your actual team can cover the shifts

Add your real shifts, workers, availability and work rules to generate a 7-day schedule and see any gaps.

Full-screen generator
1 of 5

What kind of team are you scheduling?

Data residencyUnited States

Choose where your roster data is processed and stored.

Data residency

The basic 24/7 staffing formula

Weekly staffed hours = hours covered per day × days covered per week × people required at once. Divide that by the weekly hours available from one worker to get raw FTE. Round up for whole people, then separately consider relief, skills and work rules. In absence mode, divide raw FTE by the remaining available share of scheduled time. In additive relief mode, multiply raw FTE by one plus the buffer.

1 post × 24 hours × 7 days = 168 staffed hours
168 ÷ 40 hours/worker = 4.20 raw FTE
At least 5 whole people before relief and other staffing limits

Why raw FTE is not enough

Capacity can still fail when only one worker has a required qualification, a night worker reaches a consecutive-work limit, someone is on leave, or the available workers cannot legally or operationally move between adjacent shifts. That is why Rosterzen shows both peak people needed at once and the broader workforce needed across the full week.

Build a free schedule to test your team

Frequently asked questions

How many full-time employees are needed to cover one 24/7 position?

One continuously staffed position requires 168 staffed hours per week. At 40 available hours per worker, the raw mathematical requirement is 4.2 FTE, so at least five whole people before accounting for leave, training, qualifications, availability or rest rules.

Why does the calculator include relief capacity?

Choose an additive buffer on demand or an unavailable share of scheduled time. A 20% additive buffer multiplies raw FTE by 1.2; 20% unavailable time divides it by 0.8. These produce different estimates. Enter your own assumptions and avoid counting the same absence twice.

Does this prove my roster will work?

No. Two teams can have the same total hours and still schedule very differently because skills, overlapping shifts, rest and availability matter. The calculator estimates capacity; Rosterzen then tests your actual staff against the shifts that need covering.