24/7 Staffing Worked Example: FTE, Absence and Shift Coverage
Calculate how many people you need for 24/7 coverage, then account for availability, leave, qualifications and relief capacity.
The first calculation is simple: one continuously staffed position requires 168 staffed hours every week. The difficult part is turning those hours into a roster that real people can work.
Start with staffed hours
Multiply hours covered per day by days covered per week by the number of people required at once. One 24/7 position is 24 × 7 × 1 = 168 staffed hours. If one worker contributes 40 hours per week, the raw requirement is 168 ÷ 40 = 4.2 FTE, which means at least five whole people before other constraints.
Why five people may still be insufficient
Raw hours do not account for annual leave, sickness, training, part-time contracts, night-only availability, specialist qualifications, minimum rest or consecutive-work limits. A team can have enough total hours and still be unable to cover a particular post on Friday.
Separate peak staffing from minimum workforce
Four continuously staffed posts require 672 hours per week. At 40 hours per worker, that is 16.8 raw FTE, or at least 17 whole full-time people before absence and roster constraints. Peak coverage is four; the workforce that sustains it across the week is much larger.
Use a capacity estimate before a full solve
A calculator is useful for estimating raw capacity. Scheduling software is useful for testing your actual people against the actual shifts. Rosterzen uses both ideas: estimate the staffing need first, then build a workable schedule and leave any positions that cannot be covered clearly visible.
Worked calculation: one continuously staffed post
Assume one person must be present at all times, each full-time worker has 40 contracted hours per week, and 15% of those hours are unavailable for planned leave, training and other absence. The absence percentage is an example input, not an industry benchmark. Exclude overtime from the base estimate so that the roster does not depend on it to function.
| Step | Calculation | Result |
|---|---|---|
| Weekly demand | 24 × 7 × 1 | 168 staffed hours |
| Raw FTE | 168 ÷ 40 | 4.2 FTE |
| Effective hours per worker | 40 × (1 − 0.15) | 34 hours |
| FTE including absence | 168 ÷ 34 | 4.94 FTE |
| Whole-person planning floor | Round 4.94 up | 5 full-time people |
Five workers provide 200 contracted hours but only 170 effective hours under this assumption. That leaves two effective hours above the requirement. It is a small buffer, and a particular week can still fail when absences cluster or only one person has a required skill. Six workers would offer 204 effective hours, but those hours still have to be available at the right times.
Absence percentage and relief allowance use different denominators
Adding 15% to 4.2 produces 4.83 FTE. Dividing by 85% produces 4.94 FTE. These are different assumptions: the first adds a buffer to demand; the second removes unavailable time from supply. An absence rate of 15% corresponds to a demand-side relief allowance of 0.15 ÷ 0.85 = 17.65%. Label the input before comparing two spreadsheets.
The staffing calculator supports both methods. Select unavailable time and enter 15% to reproduce this example, or use an additive relief allowance of approximately 17.65%. If you already deducted leave from each worker's available hours, do not add the same leave allowance again.
Turn FTE into a headcount and eligibility check
FTE measures hours; headcount measures people. Two part-time workers with 20-hour contracts together supply one 40-hour FTE. For two posts operating continuously, demand becomes 336 hours and the same absence assumption gives 9.88 FTE, or ten whole full-time workers as a mathematical floor. It does not prove that ten particular workers can cover every night and qualification requirement.
- List contracted hours and actual availability separately.
- Group demand by role, location and time interval.
- Check which eligible workers can cover each group.
- Test the full roster with leave, overlap and rest rules.
- Inspect the open shifts before reducing the staffing estimate.
A two-post example with a qualification bottleneck
Two posts each staffed continuously need 336 hours per week. With a 40-hour contracted week and the same illustrative 15% absence rate, each full-time worker supplies 34 effective hours: 336 ÷ 34 = 9.88 FTE, rounded up to ten full-time people as a capacity floor. Four workers on 20-hour contracts supply the same contracted hours as two 40-hour workers; headcount and FTE are not interchangeable.
Now suppose only two of those ten workers are eligible for Post A. Together they supply 68 effective hours against 168 required on that post, leaving a 100-hour qualification shortfall despite sufficient pooled hours. Adding unqualified capacity at Post B cannot fill it. If one of the qualified workers is unavailable for an entire week, check that week's actual capacity separately rather than applying the average absence allowance again.
This is an illustrative calculation, not a generated customer roster. To evaluate the real team, enter role-specific coverage, individual availability and rest limits in the full app. Inspect which duties remain open before deciding whether the shortage is headcount, eligibility or shift timing.
Keep the payroll assumption separate
Forty hours is the example's contracted-week input, not a universal legal cap. For US covered nonexempt employees, the Department of Labor explains the federal overtime threshold. Other jurisdictions and agreements differ. A payroll threshold, a fatigue policy and a scheduling limit should not be silently treated as the same rule.
Next, compare a complete shift-pattern and relief calculation, then test a 24/7 roster using your actual staff.
RELATED RESOURCE
Use the 24/7 staffing calculator
Try it before you sign up
Build a free schedule and see the result first
Use the free schedule generator to create a 7-day preview. You will see the full roster before we ask for an email. If it is useful, email yourself a copy and carry the same result into Rosterzen without starting over.
No account needed to generate the preview. Email is only requested if you want a copy.